(: Welcome to Official Iladiena Zulfa Blog :)

0

Contoh Teks Berita dalam bahasa inggris

Posted by zulfailadiena.blogspot.com on 06.29 in ,
Good morning audience, meet me again, Jasmine Nurfitri Yamandharlie. In J.Y News, edition of (Wednesday, December 04, 2013).

Today we have a news from Pamulang, precisely on the Siliwangi road, Pamulang, South Tangerang. To minimize the density of roads, Tangerang’s governor repaired and widened main roads in Pamulang district and surrounding.

This project has been done since 2012, but until now, it has not been resolved. Result from this unfinished work, a fairly length jam happened. Road widening and concretization project had finished on the right side only. For worse, the parts of the road have been concreted was not connected. It caused unbalance of road’s height until 30 centimeters between the concrete road and the old road that had been asphalted. Not only that, the road that is used for 1 line become 2 lines. Consequently, passing vehicles are disrupted. Whereas the new road can not used because it has not fully connected. Plus the road that can be used for two-way vehicle contain a lot of holes. Like in front of the shopping center Pamulang Square. There, the street filled with the holes with a diameter of between 5-10 centimeters. Many people hoped that this project can be completed as soon as possible so that no longer jams happens.


OK viewers that was the newsflash from me. Thank you for watching. I am Jasmine, See you.

|

0 Comments

Posting Komentar

Copyright © 2009 ILADIENA ZULFA All rights reserved. Theme by Laptop Geek. | Bloggerized by FalconHive.